Hot-dipped Galvanized Steel Frame For Garage With Colored Steel
Roof &Wall
Steel is a durable, economical and aesthetically
pleasing framing material for parking structures
* Lower construction costs
* Reduced maintenance costs as opposed to escalating restoration
costs
* Reduced foundation requirements resulting from a lighter
structure
* Fewer, smaller columns, providing greater parking density and
more parking spaces
* Bright, open interiors enhancing patron security and comfort
* Architecturally Flexible (can use any type of façade) and
flexible layout options for irregular sites
* Convenience and ease of future vertical and horizontal expansion
* Simplicity of design and inspection
* Safe and economical to erect in winter months
* Superior long-term durability: corrosion protection with proper
application of high performance coatings or hot dip galvanizing
extends service life.
* In most cases, open-deck, stand alone steel framed parking
garages require no fire protection.
--Components
Main Steel Frame | Column | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section |
Beam | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section | |
Secondary Frame | Purlin | Q235/Q345/ G450 C and Z purlin |
Knee brace | Q235B Angle Steel | |
Tie Rod | Q235B Circular Steel Pipe | |
Brace | Q235B Round Bar | |
Vertical and Horizontal Support | Q235B Angle Steel, Round Bar or Steel Pipe | |
Maintenance system | Roof Panel | EPS Sandwich Panel / Glass Fiber Sandwich Panel /Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet |
Wall Panel | Sandwich Panel / Corrugated Steel Sheet | |
Accessories | Window | Aluminium Alloy Window / PVC Window / Sandwich Panel Window |
Door | Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door | |
Rainspout | PVC | |
Live load on Roof | In 120kg/Sq.m (Color steel panel surrounded) | |
Wind Resistance Grade | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure Usage | Up to 50 years | |
Finishing Options | Vast array of colors and textures available | |
Paint Options | Zinc rich epoxy painting, one primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized. |
Pre-Sales Service
* Inquiry and consulting support.
* Scheme drawing -Building Drawing & Structure Drawing.
* Visiting Factory
Compay Name: | ||||||||
Client | Tel/Fax: | E-mail: | ||||||
Building Basic Information | ||||||||
Project: | Project No.: | |||||||
Location | Building Usage | Total area | ||||||
Length (m) | Width (m) | Eave Height (m) | ||||||
Roof material | ||||||||
Wall material | ||||||||
Design Load and Meteorological Conditions | ||||||||
Wind load (kn/m2) | Wind speed (m/sec) | Snow load (kn/m2) | ||||||
Rainfall Capacity | Earthquake Grade | |||||||
Please fill out the below information if your building has the mezzanine | ||||||||
Height of Mezzanine(m) | Usage of mezzanine | |||||||
Live load on mezzanine(kn/m2) | ||||||||
Please fill out the below information if your building has the crane | ||||||||
Capacity (t) | Span (m) | Quantity | ||||||
Hoisting height (m) | Other information about crane |
After-Sales Service
* Design: construction drawings, shop drawings, installation
drawings available
* Fabrication: we could fabricate all kinds of steel structure
elements in time and with high quality
*Installation: At the request of the customer, we could send one or
two engineer to guide installation, or a small team to install at
the same time
teaching the local workers to install , or enough workers to
install all the goods by ourselves.That depends on whether the cost
is economical.
Hongfa Steel Structure Mats. Co., Ltd.
Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing center, steel business international trading, sectional steel, hot-rolled steel, long steel and flat steel trading. After more than 20 year development, Hongfa group have 6 big factories in mainland China, and 3 company in Hong Kong, and one office in Singapore.
BRANCHES OF HONGFA STEEL GROUP | |||
COMPANY NAME | TEL | FAX | ADDRESS |
DONGGUAN HONGFA STEEL STRUCTURE MATS. CO.,LTD | 0086-769-86768228 | 0086-769-86734545 | SHANGJIE HUANGJINJI INDUSTRIAL ZONE, QISHI TOWN, DONGGUAN GUANG DONG. P.R. CHINA 523501 |
DONGGUAN HONGJUN STEEL TRADING CO.,LTD | 0769-86731999 | 0769-86722075 | HONGFA STEEL BUILDING, RENMIN ROAD, QISHI TOWN, DONGGUAN GUANG DONG. P.R. CHINA 523501 |
DONGGUAN HONGSHUN METAL& MATERIALS CO.,LTD | 0769-86768222 | 0769-86768688 | LIANXING INDUSTRIAL ZONE, QISHI TOWN, DONGGUAN GUANG DONG. P.R. CHINA 523501 |
DONGGUAN HONGGANG STEEL ENGINEERING CO.,LTD | 0769-86727322 | 0769-86727336 | SHANGJIE HUANGJINJI INDUSTRIAL ZONE, QISHI TOWN, DONGGUAN GUANG DONG. P.R. CHINA 523501 |
SIHUI HONGTAI STEEL STRUCTURE MATS.CO.,LTD | 0758-3810788 | 0758-3810638 | ASIA METAL REPRODUCTION INDUSTRIAL PARK, ZHAOQING, GUANGDONG. P.R. CHINA 526200 |
FOSHAN GUANSHUN FACTORY | 0757-28903122 | 0757-28903121 | HUANAN( INTERNATIONAL) MATERIAL CIRCULATION STEEL TRADING CENTER, LECONG TOWN, SHUNDE DISTRICT, FOSHAN, GUANGDONG, P.R. CHINA 528315 |
( HONGKONG) WANG FA STEEL CO.,LTD | 00852-28052308 | 00852-35850746 | Room 2809, 28/F, Wu Chung House, 213 Queen's Road East, Wan Chai, Hong Kong |
( SINGAPORE) WANG FA STEEL CO., PTE LTD | 0065-63334006 | 0065-63334113 | 12B upper circular road singapre 058410 |