
Durable Drill Gyrator Assembly Red Color For Water Well Drilling Rig ISO 9001 Approved
Structure: Most of the parts of the gyrator are installed in the vertical
shaft box. The small bevel gear is mounted on the inner gear shaft
through the spline. The ring seat has a ring-shaped "T" bolt and is
combined with five "T" bolts. The sleeve is fixed, and the nut on
the “T” bolt can be loosened to adjust the tilt angle of the
gyrator to achieve angular drilling.
Drilling rig parameters
GK-200 Type | |||
Drill | Swivel Head | ||
Drilling depth | Max.200m | Spindle speed | (4-speed) 115 230 505 1010r/m |
Hole diameter | Max.300mm | Spindle stroke | 450kmm |
Drill rod diameter | 50mm | Spindle pull-down | Max.15KN |
Angle range | 90-75 | Spindle lifting capacity | Max. 25KN |
Oil pump | Water pump | ||
Model | YBC-20/125 | Model | Horizontal reciprocating single-acting piston pump |
Rated pressure | 12.5Mpa | Working pressure | Max. 1.2Mpa |
Flow speed | 20ml/r | ||
Rated speed | 2000r/min | ||
Hoist | Power(diesel) | ||
Max. lifting capacity | 15KN | Model(diesel engine) | 1115 |
Hoisting drum revolution | 20.39.85.170r/m | Rated power | 20KW |
Drum diameter | 140mm | Rated speed | 2200r/m |
WEIGHT | AROUND 525KG | ||
SIZE | 1433x697x1273mm |
Drilling rig accessories
The connection between the gyrator and the gearbox is to fix the
turret seat on the gearbox body with 8 bolts. The large bevel gear
is connected with the vertical bushing via a key, and the vertical
bushing is connected with the vertical car through the hexagonal
hole, thereby driving the vertical shaft to rotate the vertical
shaft in the vertical shaft. The sleeve can be moved axially, and
the movement is realized by pushing the piston rod and the beam
into the upper chamber or the lower chamber of the cylinder.
The top shaft is terminated with a top sleeve, and the top sleeve
is provided with six steel balls. When the anti-manipulation handle
is pressed downward, the six steel balls are pushed toward the
center of the vertical shaft through the inner jacket, and the
semicircular communication groove of the drill pipe is embedded in
the upper shaft. Inside, the drill pipe is clamped on the machine
to realize the movement of the drill. When the handle is lifted up,
the steel ball is disengaged from the drill pipe and can be
inverted.
In order to display the scale of the vertical shaft stroke, a top
sleeve with a hexagonal hole is arranged at the upper end of the
vertical shaft, and the rotary motion can be transmitted to the
drill pipe of the hexagonal machine.
How can we do a good job in the maintenance of well drilling rig?
Today, I'll talk about the five steps of well drilling rig
1. Pay attention to check whether the bolts and nuts of water and gas pipelines and various accessories of the drilling rig are firm at any time
2. . Always check the lubricating oil condition of the wind motor
3. . When the working face is immersed in water, a large-diameter drill head shall be used to insert the drill pipe when opening the hole, so that the drill pipe is 1-2 meters above the water surface to prevent mud and rock slag from falling into the hole
4. . The drilling rig is not allowed to reverse during drilling operation, so as to prevent the drill pipe from falling into the hole
5.. When the drilling rig stops working for a short time, a small amount of air pressure shall be given to prevent sediment from invading the interior of the percussion device of the drilling rig. If the drilling rig stops working for a long time, the percussion device shall be lifted 1-2m away from the hole bottom for fixation
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and
processing company for core drilling rigs, crawler drilling rigs, various track chassis, various
types of mud pumps, various track transport vehicles, etc. It is one of the outstanding
manufacturers of similar products in North China. Strong technical force. The modern productiona
equipment and complete testing means are specialized in the development, manufacture and
marketing of drilling rigs.
To ensure the quality and stability of the machine, we use the most advanced production and testing
equipment, Made from high quality materials, with fashion and compact design, that keeps our drilling
rigs more efficiency and with low failure rate, more economic and durable, and with a high comprehensive
cost performance. Our water drilling rigs have received the real market validation as the majority of our
customer’s positive feedback.
The company's main products are rigs: XY-1, XY-1A, XY-1B, GK-180, GK-200, DPP-100 and other series
of drilling rigs: gearbox assemblies and gyro assemblies for various rigs, Winch assembly, reducer assembly,
pump assembly. Drilling tools: sedimentary pipe joints, casing joints, casing couplings, drill pipe joints, casing
core pipes, lifters, automatic drop hammers, earth borrowers, standard penetrations, forks, lock joints, alloy drill
bits Hundreds of drilling tools, such as steel sand drill bits, core pipe joints, drill pipe pliers, and casing pliers.
Jinzhou City Shitan Mechinery Equipment CO. LTD. has a complete and scientific quality management
system. The integrity, strength and product quality of Jinzhou Stone Exploration Machinery Co., Ltd. have been
recognized by the industry. Welcome friends from all walks of life come to visit, guide and negotiate business!